HotDays, compra tus libros con 80% dcto y envío express  ¡Ver más!

menú

0
  • argentina
  • chile
  • colombia
  • españa
  • méxico
  • perú
  • estados unidos
  • internacional
portada Force Majeure in the Hydropower Industry: Concepts and Case Studies (en Inglés)
Formato
Libro Físico
Editorial
Idioma
Inglés
N° páginas
156
Encuadernación
Tapa Blanda
Dimensiones
23.4 x 15.6 x 0.9 cm
Peso
0.24 kg.
ISBN13
9783031274015

Force Majeure in the Hydropower Industry: Concepts and Case Studies (en Inglés)

Daniel Constantin Diaconu (Autor) · Springer · Tapa Blanda

Force Majeure in the Hydropower Industry: Concepts and Case Studies (en Inglés) - Diaconu, Daniel Constantin

Libro Nuevo

$ 247.578

$ 495.156

Ahorras: $ 247.578

50% descuento
  • Estado: Nuevo
  • Quedan 94 unidades
Origen: Estados Unidos (Costos de importación incluídos en el precio)
Se enviará desde nuestra bodega entre el Lunes 05 de Agosto y el Lunes 19 de Agosto.
Lo recibirás en cualquier lugar de Colombia entre 1 y 5 días hábiles luego del envío.

Reseña del libro "Force Majeure in the Hydropower Industry: Concepts and Case Studies (en Inglés)"

Presented with the Award of the Senate of the University of Bucharest for the most prestigious book in the field of Life and Earth Sciences, 2022-2023. This book aims to highlight the particular situation faced by certain hydropower companies by the fact that they cannot fulfil their contracts due to force majeure. The first part of this book will be an analysis of how water is used in electricity production. It is important to point out that all types of energy sources use water, to a different extent, of course, and that its spatial and temporal availability is very important. The focus will be on hydropower, presenting the current situation at the global level, and the effect of reducing the amounts of water in the river system.The second part is based on the presentation of the concept of force majeure and the ways of presenting and drafting it in a contract. Many disputes or the success of a contract depended heavily on the provisions of this article of the contract. Obviously, there are also situations in which the signatory parties abuse or are not protected by these provisions of force majeure. Starting from a few brief examples from the international level, we reach a wide discussion of the situation created in Romania, when the largest supplier of electricity produced on the basis of water terminates several contracts invoking force majeure. The manner in which the opinion of the parties involved is presented to the court is analyzed and presented in detail.

Opiniones del libro

Ver más opiniones de clientes
  • 0% (0)
  • 0% (0)
  • 0% (0)
  • 0% (0)
  • 0% (0)

Preguntas frecuentes sobre el libro

Todos los libros de nuestro catálogo son Originales.
El libro está escrito en Inglés.
La encuadernación de esta edición es Tapa Blanda.

Preguntas y respuestas sobre el libro

¿Tienes una pregunta sobre el libro? Inicia sesión para poder agregar tu propia pregunta.

Opiniones sobre Buscalibre

Ver más opiniones de clientes