Compartir
Air Quality Implementation Plans - Approval and Promulgation - Infrastructure Requirements for the 2008 Ozone and 2010 Sulfur Dioxide National Ambient (en Inglés)
The Law Library
(Autor)
·
Createspace
· Tapa Blanda
Air Quality Implementation Plans - Approval and Promulgation - Infrastructure Requirements for the 2008 Ozone and 2010 Sulfur Dioxide National Ambient (en Inglés) - The Law Library
Libro Nuevo
Importado
Envío: 19 a 25 días háb.
$ 168.639$ 84.319
Costos de importación incluídos en el precio ✅
Reseña del libro "Air Quality Implementation Plans - Approval and Promulgation - Infrastructure Requirements for the 2008 Ozone and 2010 Sulfur Dioxide National Ambient (en Inglés)"
Air Quality Implementation Plans - Approval and Promulgation - Infrastructure Requirements for the 2008 Ozone and 2010 Sulfur Dioxide National Ambient (US Environmental Protection Agency Regulation) (EPA) (2018 Edition) The Law Library presents the complete text of the Air Quality Implementation Plans - Approval and Promulgation - Infrastructure Requirements for the 2008 Ozone and 2010 Sulfur Dioxide National Ambient (US Environmental Protection Agency Regulation) (EPA) (2018 Edition). Updated as of May 29, 2018 The Environmental Protection Agency (EPA) is approving portions of two State Implementation Plan (SIP) revisions submitted by the Commonwealth of Pennsylvania through the Pennsylvania Department of Environmental Protection (PADEP) pursuant to the Clean Air Act (CAA). Whenever new or revised National Ambient Air Quality Standards (NAAQS) are promulgated, the CAA requires states to submit a plan for the implementation, maintenance, and enforcement of such NAAQS. The plan is required to address basic program elements, including but not limited to regulatory structure, monitoring, modeling, legal authority, and adequate resources necessary to assure implementation, maintenance, and enforcement of the NAAQS. These elements are referred to as infrastructure requirements. PADEP made submittals addressing the infrastructure requirements for the 2008 ozone NAAQS and the 2010 sulfur dioxide (SO 2) primary NAAQS. This book contains: - The complete text of the Air Quality Implementation Plans - Approval and Promulgation - Infrastructure Requirements for the 2008 Ozone and 2010 Sulfur Dioxide National Ambient (US Environmental Protection Agency Regulation) (EPA) (2018 Edition) - A table of contents with the page number of each section
- 0% (0)
- 0% (0)
- 0% (0)
- 0% (0)
- 0% (0)
Todos los libros de nuestro catálogo son Originales.
El libro está escrito en Inglés.
La encuadernación de esta edición es Tapa Blanda.
✓ Producto agregado correctamente al carro, Ir a Pagar.